Eric Peterson's Railroad

The traditional 2 rail O Scale layout was started in 1976 and has been built in sections to facilitate moving.  The expanded bench work has been completed expanding from 19’ x 25’ to 19’ x 41 in the 5th basement after moving from the 2nd garage in 2017.  The layout is being rewired for DCC operation and the later addition of CMRI signals.  Equipment extends from CSX and predecessors back to steam.  The main line has been connected using an extended viaduct and the 8 track yard is operational.  Scenery is substantially complete on the reused layout sections.  I am using different wiring standards to simplify construction as well as sectional construction.

Last Updated on 11/24/2021